Make utility bills understandable, catch errors, and identify the biggest cost levers (rate plan vs demand vs behavior).
By the end of this bundle you will:
90 minutes
One high-cost site (one bill period) end-to-end
2 weeks
Standardize for top 10 sites by spend and create a monthly routine
If you can't consistently retrieve bills, you can't improve anything.
(If access is messy, use the Utility Account Access & Inventory Playbook.)
Use the Blended Electricity Rate & Demand Share Calculator to compute:
Goal: separate "this is a demand problem" from "this is a rate/energy problem."
Check for common, high-frequency issues:
Log issues and track resolution.
Use your calculated outputs to choose the correct lever:
If demand share is high (often >20–30%):
Peak management and load shifting likely matters (go to the Peak Demand Bundle)
If blended $/kWh is unusually high:
Rate schedule evaluation and TOU strategy likely matters (tariff optimization)
If "Other" is unusually high:
Investigate riders, taxes, fees, penalties, and billing mistakes
Minimum routine:
↓ See templates section below
| Site | Utility provider | Account # | Period start | Period end | Total $ | Total kWh | Blended $/kWh | Demand $ | Demand % | Other $ | Issue found | Action | Owner | Due | Evidence link |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
Beginner note:
If you don't have demand $ broken out, leave it blank for now. You can still compute blended rate and start tracking.
Billing Error Checklist Rate / classification - Does the rate schedule/class match the site type? - Any recent changes that need explanation? Period integrity - Billing period dates present? - Overlaps or gaps vs prior bill? Charges - Demand charges present and consistent with expectations? - Any unusual riders/fees? - Late fees or penalties? (process issue) Reads / usage - Estimated read repeated? - Usage spike/drop without explanation? Evidence - Bill PDF stored with stable link? - Key fields captured (dates, kWh, $)?
Utility Cost Levers (per site) Fast fixes (0–30 days): - billing dispute / error correction - rate schedule/class verification - AP process fix to eliminate late fees - secure portal access and evidence storage Operational levers (30–90 days): - schedule enforcement (hours of operation) - peak management and load shifting - basic setpoint and sequencing tuning Tariff/rate levers (90+ days): - TOU strategy improvement - rate schedule change (where eligible) - interval data strategy for deeper optimization
Monthly Utility Review (20 min) 1) Top 5 cost sites this month (5 min) 2) Any major anomalies? (5 min) 3) Demand share leaders (peak targets?) (5 min) 4) Billing disputes and actions status (5 min) Outputs: - Updated utility bill review log - Owners + due dates for actions - Sites escalated to Peak Demand Bundle or Tariff review
If demand share is meaningful
Coming soon
If reporting/claims are a priority
Coming soon
v1.0 (2026-01): Latest release